News

Modular Hydraulic power pack Castings

Modular Hydraulic power pack Castings

Thomas Hornber

Modular hydraulic power packs are compact, high-performance systems designed to generate hydraulic energy to drive heavy machinery, valves and other critical infrastructure components. These units are commonly used infrastructure, marine,...

Modular Hydraulic power pack Castings

Thomas Hornber

Modular hydraulic power packs are compact, high-performance systems designed to generate hydraulic energy to drive heavy machinery, valves and other critical infrastructure components. These units are commonly used infrastructure, marine,...

Ship building is back!

Ship building is back!

Ryan Pelayo

Jalna Construction are proud to have manufactured and launched our second vessel a 14 meter work boat that’s gone to Scotland earning its keep on the Salmon farms. Sure you...

Ship building is back!

Ryan Pelayo

Jalna Construction are proud to have manufactured and launched our second vessel a 14 meter work boat that’s gone to Scotland earning its keep on the Salmon farms. Sure you...

Pauline Mary Launched

Pauline Mary Launched

Ryan Pelayo

The Pauline Mary launched for sea trials this weekend, after being flagged in and fitted out for gill netting and potting.

Pauline Mary Launched

Ryan Pelayo

The Pauline Mary launched for sea trials this weekend, after being flagged in and fitted out for gill netting and potting.

Boat No. 3 coming along nicely!

Boat No. 3 coming along nicely!

Ryan Pelayo

This week Team Jalna have been working on our 3rd steel vessel which will be a 10 meter crabber.

Boat No. 3 coming along nicely!

Ryan Pelayo

This week Team Jalna have been working on our 3rd steel vessel which will be a 10 meter crabber.

Aluminium Boat Refurbishment

Aluminium Boat Refurbishment

Ryan Pelayo

We have recently taken delivery of 2 aluminium vessels into the workshop to be re-skinned. Watch this space for progress updates.

Aluminium Boat Refurbishment

Ryan Pelayo

We have recently taken delivery of 2 aluminium vessels into the workshop to be re-skinned. Watch this space for progress updates.

Newly Fabricated Pieces

Newly Fabricated Pieces

Ryan Pelayo

Jalna’s skill and attention to detail prevails in the fabrication of these marine grade aluminium access stairs for marine application, which have been lug tested to offshore standard, and architectural...

Newly Fabricated Pieces

Ryan Pelayo

Jalna’s skill and attention to detail prevails in the fabrication of these marine grade aluminium access stairs for marine application, which have been lug tested to offshore standard, and architectural...